Flow 01
Goods receipt and put-away
Receiving is where the company records what it now owns and what it has agreed to pay for. When receipts are keyed in later from the driver's paperwork, the PO is closed in full, a short delivery is paid in full and the stock figure is wrong from the first day.
- Starts when
- A supplier delivery reaches the Tuas dock with its delivery order, or a packing list arrives by email ahead of an import container.
- Ends with
- A posted goods receipt with counted quantities, bins and batches, and the original delivery order attached. PO lines show what was received and what is still open, and the receipt is ready for the supplier invoice match.
- 1.Person: Storekeeper
Photographs the supplier's delivery order at the dock and uploads it to the receiving queue, or forwards the packing list that came by email.
- A delivery order with the same supplier and DO number as one already received is blocked as a duplicate.
- 2.Agent: Document intake agent
Reads the delivery order, matches the supplier and each line to an open PO, and drafts the goods receipt with the quantities the document states.
- The PO number printed on the document is tried first. Without one, the agent lists the supplier's open POs that carry the same items, and the storekeeper picks one.
- Supplier item codes are matched through the supplier's item cross-reference before any match on description.
- Supplier units are converted with the item's pack size, so a carton of 10 boxes becomes 10 boxes.
- A field it cannot read clearly is left blank and flagged. A line that is on no open PO is flagged and never added to the receipt.
- 3.Person: Storekeeper
Counts each line on the pallet and enters the counted quantity, setting aside and photographing any damaged units.
- The counted quantity is a separate field from the document quantity, so a DO that says 10 does not become 10 received by default.
- Damaged units are entered as their own quantity, with a photo attached to the line.
- 4.System: System
Compares the counted quantity with the delivery order and with the open PO quantity on each line, and marks the line full, short, over or damaged.
- Counted below the PO open quantity: short, and the balance stays open on the PO.
- Counted above the PO open quantity: received only up to the supplier's over-receipt tolerance (0% unless agreed), and the excess is held as not received.
- Counted different from the delivery order: the storekeeper notes the difference on the driver's copy before the driver leaves, because the signed copy is the evidence for any claim.
- 5.Person: Storekeeper
Enters the batch number and expiry date, or the serial numbers, for lines on items tracked that way.
- Asked only for items flagged for batch, expiry or serial tracking. A box of screws asks for nothing.
- An expiry date earlier than the receipt date plus the item's minimum shelf life (for example 180 days for sealant) holds the line for the purchasing lead.
- 6.System: System
Posts the receipt into the Tuas receiving bay and suggests a put-away bin for each line.
- Stock in the receiving bay counts as on hand, but no pick list sends a picker to it.
- Bin suggestion order: the item's home bin, then an overflow bin in the same zone with space, then any empty bin.
- An expiry-tracked item goes to a bin that holds no other batch of the same item, so picks can take the earliest expiry first.
- 7.Person: Storekeeper
Scans the bin label at put-away, which moves the stock from the receiving bay into the bin.
- A bin other than the suggested one is accepted if it exists at Tuas, and is logged as an override.
- 8.System: System
Updates the received quantities on the PO lines as soon as the receipt is posted, without waiting for put-away, and releases the receipt for the supplier invoice match.
- The receipt carries the PO price, so the invoice match compares the bill with what was received, line by line.
- The log keeps the original document, what the agent read, what the storekeeper changed and who posted the receipt.
Exceptions
- The delivery is short
- The receipt records what arrived and the PO line keeps the balance open. The buyer decides whether to wait for the balance, cancel it or ask for a credit, and the supplier's invoice is matched to the quantity received.
- The delivery is over the PO quantity
- Within the supplier's tolerance, it is received. Beyond it, the excess stays in the receiving bay as not received until the buyer either amends the PO, which goes through purchasing approval, or arranges a return.
- Units arrive damaged
- Damaged units are received into a quarantine bin with the photos attached, so they are on record but not free to sell. The storekeeper raises the return against the receipt line, the buyer asks the supplier for a return authorisation, and the purchasing lead approves the remedy.
- An item arrives that is on no open PO
- The line is left off the receipt and flagged. The buyer decides whether it is a substitute to accept against a PO line or a wrong delivery to send back.
- The photo is unreadable, or the DO has no PO number
- The agent leaves the unclear fields blank and lists the supplier's open POs. The storekeeper picks the PO and keys the quantities from the count.
Worked example
GRN-0932 for PO-0418 from Meridian Fasteners
- PO-0418: 25 boxes of M8 hex bolts at S$18.40 and 10 boxes of M8 nuts at S$21.00.
- Delivery order DO-55871, read from a photo, lists 25 and 10. The storekeeper counts 25 and 8, and notes the 2 short on the driver's copy.
- GRN-0932 posts 33 boxes into the receiving bay, and both lines are put away to bay B2.
- Received value: 25 × S$18.40 = S$460.00 plus 8 × S$21.00 = S$168.00, so S$628.00 before GST and S$684.52 with GST.
- PO-0418 keeps 2 boxes of nuts open. Meridian's invoice for S$730.30 is matched to the S$684.52 received, a difference of S$45.78.
Sample data. Harbourline Supplies Pte Ltd is not a real company.